ECOfluid’s industrial aquaculture installation was selected by the Engineers and Geoscientists of BC as a 2020/2021 project highlight. ECOfluid designed and supplied an 80 m3/d plant to reduce pollutant discharge, specifically BOD5 and ammonia, to well below the maximum levels permitted by MetroVancouver, bringing the client into compliance and allowing for potential future process water reuse.
More information can be found on page 33 of the EGBC publication.